
AES Andes starts 146 MW/438 MWh battery storage project in Chile
AES Andes has started commercial operations at Bolero BESS, a 146 MW/438 MWh BESS located alongside the 146 MW Bolero solar plant in Sierra Gorda, in Chile’s Antofagasta region. The lithium-ion BESS is paired with the Bolero solar plant, which…


